medtran49
Forum GOD!
I've got all the lighting done in my bazaar stall, waiting for the new ribbon I ordered for trim and belt, and cord to make sandals for my guy. Then, it's done!
Next project is Venetian Carnivale themed. Got my doll kit a couple of days ago, and have everything, I hope, for my scene box. I'll probably start on that tomorrow.
I went through the majority of my supplies, still have 1 small and 1 big box to go, and separated and labeled large and small plastic boxes.
Rented an inside, A/C'd storage unit in August because I'm getting a bit paranoid about all these storms. It's a solid concrete block building recently built so under newer hurricane building codes, our unit is on the second floor, so no flooding unless we have a tidal wave. Going to keep mini stuff I'm not working on in there, plus Craig's guitar and Cajun accordion that he never plays anymore, but won't give up, plus some other things we've never unpacked since we downsized. Figured I'd keep some bottled water in there during hurricane season.
Next project is Venetian Carnivale themed. Got my doll kit a couple of days ago, and have everything, I hope, for my scene box. I'll probably start on that tomorrow.
I went through the majority of my supplies, still have 1 small and 1 big box to go, and separated and labeled large and small plastic boxes.
Rented an inside, A/C'd storage unit in August because I'm getting a bit paranoid about all these storms. It's a solid concrete block building recently built so under newer hurricane building codes, our unit is on the second floor, so no flooding unless we have a tidal wave. Going to keep mini stuff I'm not working on in there, plus Craig's guitar and Cajun accordion that he never plays anymore, but won't give up, plus some other things we've never unpacked since we downsized. Figured I'd keep some bottled water in there during hurricane season.